| 169 | 3 | 88 |
| 下载次数 | 被引频次 | 阅读次数 |
简述了单向三角高程测量原理,通过相关项目的应用论述了单向三角高程测量的可行性,再利用项目实例,论证了利用高精度的测量仪器通过单向三角高程测量进行大坝垂直变形监测是成功的。该方法减轻了常规的水准测量或静力水准测量的劳动强度,节约了成本,提高劳动效率,可作为后期项目的借鉴。
Abstract:This paper summarized the principle of single direction trigonometric leveling in the beginning and concluded that it's possible using this method to monitor dam vertical settlement by referring projects. Finally, the paper testified this method with accurate data and gave some advises in using single direction trigonometric leveling in dam vertical settlement monitoring. The contents and conclusions of this paper had significant consulting meaning and practicable value for production practice.
[1]袁天奇,张冰.大坝外部变形监测技术现状与发展趋势[J].水力发电,2003(6):52-55
[2]郏红伟.GPS水准测量应用探讨[J].测绘通报,2005(8):34-38
[3]孔祥元,郭际明.控制测量学[M].武汉:武汉大学出版社,2006
[4]刘朋俊,丁万庆,张荣林.TCA2003在小浪底工程外部变形监测系统中的应用研究[J].广西水利水电,2003(2):3-7
[5]孙景领,黄腾,邓标.TCA2003全站仪自动识别系统ATR的实测三维精度分析[J].测绘工程,2007,16(3):48-51
[6]李双平,方涛,王当强.测量机器人在溪洛渡电站变形监测网中的应用[J].人民长江,2007,38(17):54-56
[7]梅文胜,张正禄,郭际明,等.测量机器人变形监测系统软件研究[J].武汉大学学报:信息科学版,2002(2):24-26
[8]张正禄,邓勇,罗长林,等.精密三角高程代替一等水准测量的研究[J].武汉大学学报:信息科学版,2006(1):5-8
基本信息:
中图分类号:P224.2
引用信息:
[1]杨敏.单向三角高程测量在大坝变形监测中的应用[J].地理空间信息,2016,14(01):97-98+6.
2016-01-29
2016-01-29
2016-01-29